TRANSCANADA KEYSTONE HARDISTY TANK TERMINAL PHASE C 2014
Location: Hardisty, Alberta, Canada
海角社区app was contracted by TransCanada Pipelines Ltd. to for the engineering, fabrication and construction of 8 open-top crude oil storage tanks with pontoon external floating roofs. The combined added storage capacity totaled 2,600,000 BBL. This project was 鈥減hase C鈥 of their Keystone Hardisty Tank Terminal (KHTT) in Hardisty, Alberta.
8
open-top crude oil storage tanks
2.6
MM BBL added capacity
Scope of Work
- (3) 250,000 BBL storage tanks (181鈥 dia. x 60鈥 ht.)
- (3) 350,000 BBL storage tanks (214鈥 dia. x 60鈥 ht.)
- (2) 400,000 BBL storage tanks (229鈥 dia. x 60鈥 ht.)